Average Asphalt Driveway Drying Time: How Long To Wait To Drive Over New Asphalt (2024)

Have you had new asphalt installed on your driveway? Or perhaps you’re planning on getting a new blacktop installation at your property. If so, you’re likely anxious to start using it! But how long do you have to wait before driving over it? The drying time will vary depending on the climate and humidity, but typically takes around 2-4 days. Driving on wet asphalt can cause damage to the surface, so be sure to take necessary precautions until it’s fully dry.

This blog post will tell you how to calculate the average drying time for your new asphalt and provide some tips on how to speed the process up. Read on to learn more!

Average Asphalt Driveway Drying Time: How Long To Wait To Drive Over New Asphalt (1)

How long does new asphalt take to dry?

Asphalt is a type of paving material that is made up of bitumen, aggregate, and sand. It is a popular choice for driveways and parking lots because it is durable and long-lasting. When new asphalt is installed, it needs time to cure or dry before it can be used. The amount of time it takes for new asphalt to dry will depend on the following factors:

  • Climate
  • Humidity
  • Air Temperature
  • Paving Thickness

In general, you can expect new asphalt to take anywhere from 48-72 hours to dry completely. However, if the weather is particularly humid or cold, it may take up to a week for the asphalt to fully cure.

Can I drive on new asphalt immediately?

It is not recommended to drive on new asphalt until it has had time to fully cure. Driving on wet or soft asphalt can damage the surface and create tire marks. It is best to wait at least 2-3 days before driving on new asphalt, although waiting a full week is ideal.

Average Asphalt Driveway Drying Time: How Long To Wait To Drive Over New Asphalt (2)

How to speed up the drying process of asphalt?

If you’re eager to start using your new asphalt, there are a few things you can do to speed up the drying process.

  1. Apply a sealcoat: Applying a sealcoat is one of the best ways to protect your asphalt and make it last longer. Sealcoating provide a barrier between the asphalt and the elements, preventing water and UV damage. They also help to fill in any cracks or irregularities in the surface. Sealcoating can be applied as soon as the asphalt has cooled down after installation.
  2. Use a heat lamp: If you live in a cold climate, using a heat lamp can help to speed up the drying process. Place the heat lamp over the asphalt and leave it on for several hours. This will help to evaporate any moisture in the pavement and make it dry faster.
  3. Keep traffic off: As much as you may be eager to start using your new asphalt, it’s important to keep traffic off of it until it is completely dry. This includes both vehicles and pedestrians. Allowing traffic on the asphalt before it is dry can damage the surface and cause tire marks.

Following these tips will help to ensure that your new asphalt dries quickly and is ready to use in no time!

The complete drying process of asphalt driveway

It takes time and one should not use it before the stipulated time. There are certain measures which if taken can speed up the process but it is better to wait for the driveway to dry completely. As mentioned prior, things like humidity, climate, air temperature, and paving thickness are all factors in how long it will take your new asphalt to dry. Depending on these conditions, it can take anywhere from 2-7 days for your new asphalt to be ready to use. If you have any concerns, it is always best to consult with a professional to get an accurate estimate for your specific project. Professional paving companies have the proper equipment to enhance the curing process and durability of your asphalt surface.

It is very important that the asphalt is completely dry before using it, otherwise it can lead to many problems. The surface may get damaged or there can be tire marks. In cold climates, if the asphalt is not completely dry it can freeze and then crack. So it is better to wait for some time so that the process is complete and then use it. There are certain things which can be done to make the process faster but it is not advisable to do so as it can lead to problems later on. As previously advised, applying a sealcoat is one of the best ways to make the process faster and also make the surface last longer.

Average Asphalt Driveway Drying Time: How Long To Wait To Drive Over New Asphalt (3)

You can tell your asphalt surface is cured when it is:

  • Hard to the touch
  • No longer soft or tacky
  • Not giving off any fumes
  • The color has changed from black to gray

We emphasize that it is always best to consult with a professional with any questions regarding the readiness of your new pavement.

Factors that can affect the cure time of asphalt

There are a few different factors that can affect the cure time of asphalt. Some of these include:

  • Humidity: Moisture in the air can slow down the drying time of your new asphalt.
  • Climate: Hot and sunny weather is ideal for drying asphalt, while cold and rainy weather can delay the process.
  • Air temperature: The air temperature also plays a role in how quickly asphalt will dry.
  • Paving thickness: A thicker layer of asphalt will take longer to dry than a thinner layer.
  • Professional equipment: Paving companies have access to professional equipment that can help to speed up the drying process.
  • Traffic: Allowing traffic on your new asphalt before it is dry can damage the surface.
  • Expert installation: Working with a professional paving company can help to ensure that your new asphalt is properly installed and ready to use in a timely manner.

Your new asphalt curing process includes many different steps that must be completed before the surface is ready for use. These steps include compaction, evaporation, and cooling.

Average Asphalt Driveway Drying Time: How Long To Wait To Drive Over New Asphalt (4)

Precautions to take while the driveway is drying

It is very important to take precautions while the driveway is drying. One should not use it before the stipulated time as it can lead to many problems. Allowing traffic on the surface before it is dry can damage it.

There are certain measures which if taken can speed up the process but it is better to wait for the driveway to dry completely. It is also advised not to use any kind of solvent or cleaner on the surface before it is completely dry. This can damage the surface.

One should also avoid washing the surface with a hose as it can disturb the drying process. It is better to wait for some time so that the process is complete and then use it.

FAQs about asphalt driveways and their drying time

How long does it take for an asphalt driveway to dry?

It can take anywhere from 2-7 days for your new asphalt to be ready to use.

What are the factors that can affect the cure time of asphalt?

Humidity, climate, air temperature, paving thickness, professional equipment, traffic, and expert installation can all affect the cure time of asphalt.

What precautions should I take while my driveway is drying?

You should avoid using the driveway before the stipulated time, allowing traffic on the surface before it is dry, washing the surface with a hose, and using any solvents or cleaners on the surface before it is completely dry.

Consulting with a professional can help you to better understand the asphalt curing process and what you can do to speed it up.

What are the steps involved in the asphalt curing process?

The steps involved in the asphalt curing process include compaction, evaporation, and cooling.

Average Asphalt Driveway Drying Time: How Long To Wait To Drive Over New Asphalt (5)

How can I speed up the drying time of my asphalt driveway?

There are a few different ways that you can speed up the drying time of your asphalt driveway. You can use professional equipment, allow traffic on the surface, and consult with a professional for expert advice.

As a conclusion, we must say that the cure time of asphalt depends on many factors and one should be very careful while the driveway is drying. There are certain measures which if taken can speed up the process but it is better to wait for the driveway to dry completely. Consulting with a professional can help you to better understand the asphalt curing process and what you can do to speed it up.

At Limitless Golden Construction we are happy to aid you with your upcoming asphalt installation project. We are the leaders for residential paving and masonry services in Westchester County, Putnam County, and surrounding areas in New York. Claim your complimentary quote or use our FREE online paving calculator. Be proactive, calculate your paving costs, trust the pros!

Do you have any questions about asphalt driveways? Leave a comment below! Also feel free to suggest any topics you’d like our construction pros to discuss.

Average Asphalt Driveway Drying Time: How Long To Wait To Drive Over New Asphalt (2024)

FAQs

Average Asphalt Driveway Drying Time: How Long To Wait To Drive Over New Asphalt? ›

Asphalt takes six to twelve months to fully cure, and remains a little more susceptible to damage for that time. However, it takes 48 to 72 hours to "dry" enough for foot and vehicle traffic. This is for new asphalt. Resurfaced asphalt can be dry in as soon as a few hours.

How long does asphalt need to dry before driving on it? ›

In general, it can take about 48 to 72 hours for the asphalt to dry to be safe for foot or vehicle traffic. There are many factors that can impact the drying time. At McConnell & Associates we work with you to plan your installation and avoid disrupting your business any more than we have to.

How long does it take for paving to settle? ›

Typically, the answer is 24 hours, but if the weather is warm or humid, it could be closer to 48-72 hours or 2-3 days. There is no doubt that coming across roadway paving construction while on your daily commute can be frustrating.

What temperature does asphalt cure? ›

Prime Conditions for Asphalt

Hot mix asphalt requires a certain internal temperature to compact and set properly. It must remain between 175 and 275 degrees. Colder weather may shorten the installation timeline, and this affects the material's stability.

How long does asphalt take to dry rain? ›

The drying time will vary depending on the climate and humidity, but typically takes around 2-4 days. Driving on wet asphalt can cause damage to the surface, so be sure to take necessary precautions until it's fully dry.

What happens if new asphalt gets wet? ›

When rain comes into contact with fresh asphalt, it causes the oil to rise to the surface, affecting the curing time and the finished product. If asphalt is paved while it's raining, it can reduce the overall quality of the asphalt. Rain also jeopardizes the stability of the subsoil.

Should I water my new asphalt driveway? ›

Your new asphalt driveway will soften and harden as the outside temperatures fluctuate. Using a hose to water down your driveway on hotter days will cool and temporarily harden the asphalt. This is helpful, but not mandatory.

How long does a driveway take to cure? ›

Your concrete should be solid enough to walk on, without leaving footprints, after anything from 24 to 48 hours. By seven days, your concrete should be cured to at least 70 percent of its full strength.

Why put sand on new asphalt? ›

Sand is often used to seal roads, and it is a great way to enhance weathered pavement. It can also fill fine cracks, provide a thicker surface coating, and delay the weathering process.

How long does a driveway take to complete? ›

How Long Does It Take to Install a Driveway?
Driveway MaterialSmall (30m²)Large (90m²)
Concrete1 - 2 days4 - 5 days
Block paving1 – 3 days4 – 7 days
Gravel1 - 2 days3 - 4 days
Resin3 – 5 days2 – 3 weeks
1 more row
Mar 7, 2023

What is the best time of year to lay asphalt? ›

The best time of year to pave asphalt is during the spring and summer months because the best temperature for hot paving is generally 70 degrees Fahrenheit or higher. It's possible to lay asphalt at temperatures as low as 50 degrees, but doing so isn't likely to bring about the best results possible.

Does asphalt cure faster in winter? ›

In terms of cold weather paving, what a contractor should be most interested in is the time they have available to achieve compaction. During cold weather, all things being equal, the asphalt mat will cool much faster than it will during warmer weather, shrinking the available compaction time.

What temperature does asphalt harden? ›

Here's why: as soon as asphalt starts to cool down it will start to cure. Coming down from 280°F to even just 220°F is enough to start the curing process. Once it drops to 185°F it becomes too stiff to be properly compacted.

Does rain soften asphalt? ›

Over time, rainwater will force the oils in asphalt out and to the surface. As precipitation permeates the ground beneath the pavement, dissolving it, structural integrity weakens, and the potential for large sinkholes increases. Driving over saturated parking lot surfaces accelerates this process.

How long does driveway need to dry before rain? ›

Although 4 to 8 hours is the minimum amount of time you should provide for drying, the longer the better. It can take at least 24 hours for the driveway sealant to cure completely but if you give it 4 hours to dry it should be able to resist the rain and any possible damage that could occur.

Is it OK if it rains after pouring asphalt? ›

After the asphalt is laid, it slowly dries and cures into a solid surface that isn't vulnerable to rain damage. However, until asphalt dries, the oil inside the fresh asphalt can react to water, causing it to rise to the surface.

How long do I have to stay off of my asphalt driveway after getting it sealed? ›

Most driveways take 24 to 48 hours to cure. You can begin walking on it within one day, but it is recommended to wait 48 hours before parking vehicles on the driveway again.

How long does it take for asphalt repair to harden? ›

Different materials use different forms of adhesion, all with varying curing times ranging from a few seconds to a few weeks. One of the most permanent forms of asphalt, hot mix, must cool and set for around 48-72 hours to fully harden.

Top Articles
Latest Posts
Article information

Author: Jerrold Considine

Last Updated:

Views: 5886

Rating: 4.8 / 5 (58 voted)

Reviews: 81% of readers found this page helpful

Author information

Name: Jerrold Considine

Birthday: 1993-11-03

Address: Suite 447 3463 Marybelle Circles, New Marlin, AL 20765

Phone: +5816749283868

Job: Sales Executive

Hobby: Air sports, Sand art, Electronics, LARPing, Baseball, Book restoration, Puzzles

Introduction: My name is Jerrold Considine, I am a combative, cheerful, encouraging, happy, enthusiastic, funny, kind person who loves writing and wants to share my knowledge and understanding with you.